THE COMMERCIAL MAINTENANCE RFP TOOLKIT

One owner brief.
Comparable proposals.

Put the same property facts, scope boundaries and response requirements in front of every bidder—then compare what is actually different.

PDF · 8 pages · No email required · Print one comparison sheet for every two bidders.

HOW TO USE IT

Make the work comparable
before comparing price.

  1. 01

    State owner-controlled facts

    Define property, zones, quantities, known conditions and required outcomes without prescribing a method you have not approved.

  2. 02

    Issue the same request

    Give each provider the same facts, service worksheet and requested response format.

  3. 03

    Normalize the differences

    Separate base scope, alternates, allowances, assumptions, exclusions and property responsibilities.

  4. 04

    Award deliberately

    Confirm operating fit, documentation, written change control and requested closeout before work is authorized.

MASTER BID COMPARISON

See what the number
does—and does not—include.

The workbook gives two providers the same review columns. Duplicate the sheet when more bidders are involved.

RequirementProvider AProvider B
Exact base scope
Confirmed, estimated and unknown quantities
Pricing and measurement basis
Proposed method and dependencies
Access, notices, staging and closures
Property responsibilities
Qualifications and vendor documents
Exclusions and alternates
Written change process
Closeout deliverables

SERVICE-SPECIFIC WORKSHEETS

Five work types.
One disciplined structure.

Each worksheet records the property facts first, then prompts both bidders to state their scope, assumptions, boundaries and closeout.

03

Exterior + aerial cleaning

Elevations, materials, zones, access options, ground controls, water, runoff, weather and closeout.

04

Air systems

System inventory, buildings and units, occupied access, exceptions, verification and location-level records.

05

Parking + line painting

Approved layout, marking inventory, surface preparation, traffic, phasing, coating and reopening.

06

Building envelope

Joints, penetrations, substrates, access, product information, weather and separate specialist boundaries.

07

Shared spaces + air quality

Approved scent zones, scent-free boundaries, feedback and pause controls, plus limited IAQ questions and information limits.

WHAT THE TOOLKIT DOES

Organizes the decision.

It helps property, facilities and procurement teams compare provider responses against one owner-controlled brief.

WHAT IT DOES NOT DO

Make the decision for you.

It does not determine method suitability, legal or insurance requirements, contractor qualification, property approval or award.

PRACTICAL PERSPECTIVE

Built from the questions
that keep work clear.

12 years300+ buildings

Our team’s building-maintenance experience informs the owner-side questions in this toolkit. The figures describe team experience that predates The Maintain Company.

READY TO COMPARE?

Start with the same facts.

Download the print-ready workbook, or build a property-specific scope brief before issuing your request.

Download the 8-page toolkit Build a scope brief Ask us to review known work